Industries

For buildings a management system never reached.

Large buildings with central plant have building-management systems. Most institutions do not. They have hundreds of separate split units, each with its own remote. That is where ProSensia starts.

ProSensia’s pilot is at a university in Pakistan. The other sectors below describe where the same device and panel are designed to fit. They are plans, not deployments.

Pilot running

Universities and schools

Timetables change every term. Rooms are empty between classes, in the evening and through the holidays, and the units do not know.

  • Units follow the uploaded timetable, room by room
  • Block and building shut-off at the end of the day
  • Auto-shutdown for a unit left running
  • Alerts for abnormal current and offline devices
Planned

Hospitals

Some rooms can never be warm, so reliability matters more than savings. A failed unit is a clinical problem, not a comfort problem.

  • Live status of every unit on one screen
  • Early warning when a unit’s behaviour changes
  • Control limited by role, with critical rooms excluded from schedules
Planned

Hotels

Occupancy changes every night. A unit cooling an unsold room costs money; a unit that fails in a sold room costs the guest.

  • Central view across floors
  • Rules for unoccupied rooms
  • Running hours per unit for maintenance planning
Planned

Offices and public buildings

The building empties in the evening. The cooling often does not. Many public buildings have hundreds of split units and no central system.

  • Schedules by floor and department
  • End-of-day shut-off
  • A record of when each unit ran
Planned

Industrial facilities

Control rooms, server rooms and offices on a plant depend on cooling that nobody watches until it stops.

  • Alerts when a unit serving a critical room stops or goes offline
  • Running-hour records for planned maintenance
Why operations, not only equipment

The fastest lever is how existing units are run.

85%

of EU buildings were built before 2000. They will be operated, not replaced, for decades.EU02

≈ 1%per year

is the rate at which EU buildings receive an energy renovation.EU03

about half

The average new air conditioner sold is about half as efficient as the best available models.G09